Railway bridge composed by three independent deck parts made of reinforced concrete and prestressed box girders. The central part is characterized by three frame-type continuous spans, constructed by the balanced cantilever method. Edge parts consist of a single isostatic span.
Intervention: Detailed Design, 2011
Client: FARES
Length: 180 m (30.00 + 30.00 + 60.00 + 30.00 + 30.00)
Location: Belo Horizonte, Brazil
Geotechnics / Mechanical Facilities / Foundations and Structures / Wastewater networks / Electrical Facilities / Integrated Safety / Gas Facilities / Energy Certification / Special Facilities / Supply and Water Distribution / Telecommunications / Acoustics / Architecture / Roadworks