Pedestrian and highway cable-stayed bridge, made of a reinforced and prestressed concrete box girder.
Intervention: Detailed Design, 2012
Client: PROSUL
Length: 190 m (100.00+90.00)
Location: Florianópolis, Brazil
Geotechnics / Mechanical Facilities / Foundations and Structures / Wastewater networks / Electrical Facilities / Integrated Safety / Gas Facilities / Energy Certification / Special Facilities / Supply and Water Distribution / Telecommunications / Acoustics / Architecture / Roadworks